With the insulated kits, the robust FerroFoam® panels and high-quality assemblies guarantee a long service life for the optionally FRC and HACCP-certified body. The kits for the BR 250-2 to BR 257-2 already contain the insulated sandwich floors, optionally with rails for load securing. The box bodies can be assembled in just 8 man hours and are fully loadable after just 24 hours.
Panel:
Steel (0.4 mm)* |
PU Foam approx. 70 kg/m³ |
Steel (0.4 mm)* |
Panel:
Steel (0,4 mm)* |
PU Foam approx. 70 kg/m³ |
Steel (0,4 mm)* |
Panel:
Steel (0,6 mm)** |
PU Foam approx. 70 kg/m³ |
Steel (0,6 mm)** |
Panel:
Steel (0,6 mm) |
PU Foam approx. 70 kg/m³ |
Steel (0,6 mm)* |
Paneel:
Steel (0,6 mm) |
PU Foam approx. 70 kg/m³ |
Steel (0,6 mm) |
Panel:
Steel (0,6 mm) |
PU Foam approx. 70 kg/m³ |
Steel (0,6 mm) |
Panel:
Steel (0,6 mm)* |
PU Foam approx. 70 kg/m³ |
Steel (0,6 mm)* |