Instead of puzzling together many individual parts, you receive a few assemblies in one delivery: the floor assembly, the front wall and the drop sides on a transport frame. This makes it possible to assemble the body (GVW 7.5-26 tonnes) in just 5 man-hours. A EN 12642 XL certificate is being prepared and will be available by the end of 2024.